We apply BIM (Building Information Modelling) as a collaborative work methodology for the creation and management of our construction projects. With this methodology we manage to centralize all the information of each project in a digital information model so all the agents can work with the same information for the benefit of the project.
In this way, in addition to sharing graphic information in 2D and 3D, we incorporate planning information (4D), costs and measurements (5D), environmental (6D) and maintenance and use of the building (7D).
BIM helps us to work in a collaborative way.
For BILBA, this methodology is the basis that allows us to work collaboratively on better projects and to incorporate industrialization and innovation in all projects. We take this collaborative process beyond the design phase, also incorporating the execution and management phase, extending in many cases throughout the life cycle of the building. BILBA's strategic plan is perfectly aligned with the BIM Plan for Public Procurement approved in 2023 and which, as of April 2024, mandates the gradual incorporation of all projects.
1. Processes: BILBA already has working procedures for the organization and digitalization of information based on UNE-EN ISO 19650, as well as specific BIM Guides. Coordination is done through a CDE or Common Data E n v i r o n m e n t, and models are used to obtain plans, 3D coordination and measurements.
2. Technology: BILBA has a common repository with access control, standardized file and folder nomenclature rules, workflows and information status according to UNE- EN-ISO 19650.
3. People: we have a trained work team that participates in each contract, defining a specific BIM manager, with the necessary technological means and experience according to the established requirements.